Sign In | Join Free | My xpandrally.com
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > Mobile Cranes >

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System

Brand Name : XCMG

Model Number : XLC260

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Maximum Wind Speed for Operation : Up to 20 m/s

Control System : Hydraulic

Maximum Lifting Height : Up to 120 meters

Engine Power : Up to 500 kW

Outrigger Length : Up to 10 meters

Maximum Working Radius : Up to 80 meters

Travel Speed : Up to 80 km/h

Boom Length : Up to 100 meters

Counterweight : Up to 100 tons

Maximum Gradeability : Up to 30%

Contact Now

260T Crawler Crane Plays A Key Role In Power Engineering Installation

XLC260 Crawler Crane Technical Specifications

Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m

Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

23

26

29

32

35

38

41

44

47

50

53

7

13.5

13.5

8

13.5

13.5

13.5

13.5

13.5

9

13.5

13.5

13.5

13.5

13.5

13.5

13.5

10

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

11

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

12

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

13.5

13.5

13.5

13.5

13.5

13.5

38

13.5

13.5

13.5

13.5

13.5

40

13.5

13.2

13.1

12.9

42

12

11.8

11.6

44

10.8

10.6

10.4

46

8

9.6

9.4

48

8.4

Magnification

1

1

1

1

1

1

1

1

1

1

1

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

56

59

62

65

68

71

74

77*

80*

11

13.5

13.5

12

13.5

13.5

13.5

13.5

13.5

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

38

13.5

13.5

13.5

13.5

13.5

13.5

13.2

13.1

12.9

40

13

12.8

12.6

12.4

12.1

12

11.7

11.7

11.4

42

11.8

11.5

11.3

11.1

10.8

10.7

10.4

10.4

10.1

44

10.6

10.4

10.2

9.9

9.7

9.5

9.3

9.2

9

46

9.6

9.3

9.1

8.9

8.6

8.5

8.2

8.2

7.9

48

8.6

8.4

8.2

7.9

7.7

7.5

7.3

7.2

7

50

7.7

7.5

7.3

7

6.8

6.7

6.4

6.4

6.1

52

6.9

6.7

6.5

6.2

6

5.8

5.6

5.5

5.3

54

5.9

5.7

5.5

5.2

5.1

4.8

4.8

4.5

56

5

4.8

4.5

4.4

4.2

4.1

3.9

58

4.1

3.9

3.8

3.5

3.5

3.2

60

3.5

3.3

3.2

2.9

2.9

2.6

62

2.7

2.6

2.3

2.3

2.1

64

2.1

1.8

1.8

Magnification

1

1

1

1

1

1

1

1

1

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.


Product Tags:

construction crawler crane 260t

      

construction crawler telescopic crane

      

260t crawler telescopic crane

      
Wholesale Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System from china suppliers

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)